Philmont Development Construction
At the start of construction, you have the opportunity to watch as the products you have selected are created. Your home is going to be built with the combined efforts of specialists in many trades - from excavation all the way to the finished product. Our job at Philmont Development is to coordinate and supervise these contributions to produce your custom home. For better understanding, we have created a Construction Timeline with a slide show for you to visually see. Although the specific sequence of construction steps varies and overlaps, generally we will build your home in the following order:
Foundation
- Stake out
- Cutting down trees
- Excavation
- Foundation installation
- Sewer and water
- Damp proof
- Inspection
- Backfilling
Interior
- Rough-in mechanical systems:
Plumbing
HVAC (heating, ventilating, and air-conditioning)
Electrical
Entertainment and alarm systems (If applicable)
Radiant Heat (If applicable)
Village rough inspections
- Insulation
- Village Inspection (after insulation)
- Drywall (Hang, tape and finish, sand)
- Prime coat of paint
- Tile and hardwood (if applicable)
- Interior trim (doors, cabinets, baseboards, casings
and other trim details)
- Hardware
- Countertops
- Paint and stain
- Appliances
- Plumbing fixtures
- HVAC - Final
- Light fixtures
- Mirrors and shower doors
- Closet wire
- Finishing hardwood (if applicable)
- Carpet
- Week of punch out (Misc. items)
- Professional cleaning
- Improvement survey
- Homeowner Orientation and
- Final Walk-through
Exterior
- Brick
- Siding (if applicable)
- Dryvit (if applicable)
- Gutter and downspouts
- Flashing
- Exterior painting or staining
- Deck (If applicable)
- Concrete - Flatwork (weather permitting)
- Final grading (towards end of process, after flatwork)